学年

質問の種類

英語 高校生

3枚までしか載せれず、解説が後半からしか無く申し訳ないです汗 写真2枚目の最後のパラグラフの最後の英文 while〜に付いてです。 和訳では、今回の発見がその謎に答えを与えるのに役立つかもしれない。 とかいてありますが、ここの構文の構造がよくわかりません。 one whic... 続きを読む

傾斜路 1~15 次の英文を読み,設問に答えよ。 Archaeologists have long wondered exactly) Egypins) Constructed th how. the ancient a)(b)(c the world's biggest pyramid the Great Pyramid Now, they may have discovered the system used to )massive stone blocks into place Some 4,500 years ago. ・採石場 システムとして残ったもの遺構 Shank 運ぶ、引きずる They discovered the remains of this system at the site of Hatnub, an ancient quarry in the Eastern Desert of Egypt The contraption E would have been used to transport heavy alabaster stones up a steep Nam according to the archaeologists (working at the site, from the Institut français d'archéologie orientale (French Institute for Oriental Archaeology) in Cairo and from the University of Liverpool 東洋の 階段 in England // And it was (possibly) (how Egyptians built the Great Pyramid, in the name of the pharaoh Khufu. の名において AV BAR "This system is composed of a central ramp 法 ~の脇に立つ flank~側面に位置する by two staircases with numerous post holes," Yannis Gourdon co-director of 3. the joint mission at Hatnub old Live Science. Using a sled which carried a stone block and was attached with ropes to these wpoden posts, ancient Egyptians were able to pull up the alabaster blocks out. very steep slopes of 20 percent or more." of the quarry 合同の そり fout of ~から 引き上げた。運びたせた

解決済み 回答数: 2
英語 高校生

写真2枚目の和訳についてです。石を斜面路に向かって持ち上げる(イメージ図3枚目)かと思ったんですが、日本語では、傾斜路を運び上げるために と書いてありよくわかりません。これはどういうことなんでしょうか?

傾斜路 1~15 次の英文を読み,設問に答えよ。 Archaeologists have long wondered exactly) Egypins) Constructed th how. the ancient a)(b)(c the world's biggest pyramid the Great Pyramid Now, they may have discovered the system used to )massive stone blocks into place Some 4,500 years ago. ・採石場 システムとして残ったもの遺構 Shank 運ぶ、引きずる They discovered the remains of this system at the site of Hatnub, an ancient quarry in the Eastern Desert of Egypt The contraption E would have been used to transport heavy alabaster stones up a steep Nam according to the archaeologists (working at the site, from the Institut français d'archéologie orientale (French Institute for Oriental Archaeology) in Cairo and from the University of Liverpool 東洋の 階段 in England // And it was (possibly) (how Egyptians built the Great Pyramid, in the name of the pharaoh Khufu. の名において AV BAR "This system is composed of a central ramp 法 ~の脇に立つ flank~側面に位置する by two staircases with numerous post holes," Yannis Gourdon co-director of 3. the joint mission at Hatnub old Live Science. Using a sled which carried a stone block and was attached with ropes to these wpoden posts, ancient Egyptians were able to pull up the alabaster blocks out. very steep slopes of 20 percent or more." of the quarry 合同の そり fout of ~から 引き上げた。運びたせた

解決済み 回答数: 1
英語 高校生

下から5行目のit would~の文構造がわからないです。back upはどのような働きをしているのでしょうか。 教えて頂けるとありがたいです。

A Makeover for Hoover Dam Hydropower has attracted increasing attention in recent years as a renewable type of clean energy. As long as a suitable water source is available, hydropower facilities are usually good investments, producing energy in a manner that generates far less air pollution and CO2 emissions than fossil fuels do. The most common way to generate hydropower is to trap water at a high elevation behind a dam so it can be released and used to spin turbines below, which, in turn, power electricity-producing generators. However, hydropower has its drawbacks. Droughts and increased water consumption have reduced the flow of many rivers. As rivers become shallower, the necessary volume of water for electricity difficult to maintain, and power supply and generation is dependability are negatively impacted. more Variability in water levels has particularly affected Hoover Dam, a mega-scale hydropower facility in the US state of Nevada. Built in the 1930s at enormous expense to control the frequently flooding Colorado River and maintain a water supply for farmland irrigation, the dam's hydropower capabilities were seen as a way to recover some of the costs of its construction over the long term. The dam's electricity-generating capacity, however, was challenged from the start by seasonal variability in water flow, and in recent years has been greatly reduced by droughts. Combining hydropower with other alternative energy sources, though, may offer a solution. Solar and wind plants can produce enormous amounts of electricity, but one serious downside is that the energy they produce is not available when there is little sun or wind. While conventional batteries can help with this issue, storing such tremendous volumes of electricity has long been a challenge. A recently proposed system for Hoover Dam could provide an answer, though. The plan suggests building a new pumping station that would be powered by both wind and solar. It would push water from the river back up to Hoover Dam, refilling the lake behind it. The water could be released anytime to power the dam's generators in order to reliably meet demand for electricity. Kelly Sanders, an engineering professor at the University of Southern California, is enthusiastic about the storage plan, saying, "We by the p replace fo solat als are st ons to the What is 1 Inst inves 2 WE dams 3 A neg sys 1 en

解決済み 回答数: 1
1/3